| #80 |
Guided labelling studio for round 1 and round 2 labels |
Sprint 2 |
| #67 |
[Decision] Sample only or full dataset for RQ1 to RQ3 (ADR-0007) |
Sprint 1 |
| #61 |
Assignment 2 Phases B and F: notebook elicitation and RESEARCH_SPEC |
Sprint 1 |
| #53 |
Validation: choose the teammate second rater for each label kind |
Sprint 2 |
| #42 |
Start here: Group 9 project workspace (P-01) |
Formation |
| #40 |
Final: AI-use log and disclosure complete |
Finalization |
| #39 |
Final: individual contribution and reflection (one per member) |
Finalization |
| #38 |
Final: presentation and live demonstration |
Finalization |
| #37 |
Final: repository release v1.0.0 and fresh-machine reproduction by a non-author |
Finalization |
| #36 |
Final: respond to feedback and finalize the report |
Finalization |
| #35 |
S3: retrospective identifying the group's most important process improvement |
Sprint 3 |
| #34 |
S3: final demonstration plan and presentation materials |
Sprint 3 |
| #33 |
S3: documented release or tagged version of the repository |
Sprint 3 |
| #32 |
S3: threats-to-validity section (dataset bias, measurement error, confounding, missing data, reproducibility, general... |
Sprint 3 |
| #31 |
S3: complete draft report with citations and clear separation of findings and interpretation |
Sprint 3 |
| #30 |
S3: final figures and tables generated from the repository pipeline |
Sprint 3 |
| #29 |
S3: error analysis and manually inspected examples |
Sprint 3 |
| #28 |
S3: robustness checks, sensitivity analysis, or comparison across meaningful subgroups |
Sprint 3 |
| #27 |
S3: final or near-final results addressing the research question |
Sprint 3 |
| #26 |
S2: sprint review package and retrospective recording changes to question, method, scope, or interpretation |
Sprint 2 |
| #25 |
S2: updated research report (background, method, implementation, preliminary results) |
Sprint 2 |
| #24 |
S2: preliminary results with reproducible figures or tables |
Sprint 2 |
| #23 |
S2: validation sample, manual annotation protocol, or other evaluation design |
Sprint 2 |
| #22 |
S2: automated tests for parsing, transformation, matching, or metric functions |
Sprint 2 |
| #20 |
S1: sprint review package and retrospective |
Sprint 1 |
| #19 |
S1: baseline process metrics captured (Measure phase) |
Sprint 1 |
| #17 |
S1: repository practice: issues, milestones, branch protection, first reviewed pull request |
Sprint 1 |
| #14 |
S1: dataset acquisition or sampling instructions and data dictionary |
Sprint 1 |
| #11 |
Kaizen: weekly process metrics automated |
Formation |
| #10 |
Kaizen: 48-hour pull request review SLA by a member other than the author |
Formation |
| #5 |
Formation: RESEARCH_QUESTION.md completed and topic brief submitted |
Formation |
| #1 |
Formation: team working agreement v2.0 signed by all four members |
Formation |