Group kickoff, 2026-09-16¶
How to use: the agenda is pre-filled. Fill notes, decisions, and action items during the meeting. Open a pull request the same day and ask another member to review it.
- Type: kickoff
- Date and time: Wed 2026-09-16, :
- Location or call link (no personal details):
- Facilitator: Jerad Dunne (Formation Scrum Master)
- Note taker:
- Attendees: [ ] Leticia Aderhold [ ] Jerad Dunne [ ] Allie Hodges [ ] Hina Kramer
- Related documents:
docs/decisions/ADR-0006-group-reinstated.md,TEAM_CHARTER.md,docs/sprints/00-formation/review.md,docs/sprints/sprint-1/planning.md,docs/workspace/DECISION_LOG.md(open questions)
Agenda (75 minutes)¶
- Welcome and confirm the group (10 min). Walk through ADR-0006: why the project briefly went solo on 2026-09-14 and what the four-person setup restores. Each member confirms they accepted the repository invitation and can open the board.
- Confirm roles (5 min). Review the proposed rotation in
TEAM_CHARTER.mdsection 3 (Sprint 1: Product Owner Jerad Dunne, Scrum Master Leticia Aderhold). Record changes inproject.ymlthrough a pull request. - Working agreement (10 min). Read
TEAM_CHARTER.mdv2.0 together, especially sections 7 (reviews), 8 (contribution), and 9 (validation independence). Each member signs section 14 in their own onboarding pull request; nobody signs for anyone else. - Topic (10 min). Walk through P-01 (issue #41) and
RESEARCH_QUESTION.md. Confirm P-01, or agree that someone opens a Decision needed issue before Sprint 1 planning on Thu 2026-09-17. - Validation second raters (10 min). Choose who second-rates each kind: signals (209 rows), lineage (58 pairs), drift (18 pairs). A split across Leticia (
la), Allie (ah), and Hina (hk) is allowed. Explain the blindness rule and the target date, Fri 2026-10-16. Record the result indocs/workspace/WORK_SIGNUP.mdsection 6. - Communication and meeting times (10 min). Choose the team channel. Fix the standing time for Thursday planning and check-ins and the review and retrospective on the last Wednesday.
- Tooling check and onboarding help (10 min). Each member runs
make setupandmake test; pair on any failure. Startmake dataif time allows. - Sprint 1 preparation (10 min). Each member files a Work sign-up for Sprint 1, states available hours, and picks one onboarding-sized issue. Confirm the topic brief goes to the instructor today.
Notes¶
-
Decisions¶
| # | Decision | Rationale | Needs an ADR? | Record |
|---|---|---|---|---|
| 1 | Four-person group confirmed | ADR-0006 | no (ADR exists) | ADR-0006, D-018 |
| 2 | Role rotation confirmed / changed | no | D-008, project.yml |
|
| 3 | P-01 confirmed / revisit issue opened | no | ADR-0004, D-012 | |
| 4 | Second raters: signals ___, lineage ___, drift ___ | no | D-020, WORK_SIGNUP.md | |
| 5 | Team channel: ___; meeting time: ___ | no | DECISION_LOG.md |
Action items¶
| Action | Owner | Due | Issue # | Status |
|---|---|---|---|---|
| Submit the Team member onboarding issue | Each member | 2026-09-16 | ||
| Open an onboarding PR: profile plus charter signature | Each member | 2026-09-17 | ||
| Review one other member's onboarding PR | Each member | 2026-09-18 | ||
| Send the topic brief to the instructor | Product Owner | 2026-09-16 | ||
| File Sprint 1 work sign-ups | Each member | 2026-09-16 | ||
Update project.yml roles if changed |
Scrum Master | 2026-09-17 | ||
| Record kickoff decisions in DECISION_LOG.md | Scrum Master | 2026-09-17 | ||
| First stand-up row | Each member | 2026-09-18 |
Parking lot¶
-