How to use: the Finalization Product Owner owns this page from Mon 2026-11-30 to Fri 2026-12-04. Nothing is submitted until every box in sections 1 and 2 is checked. Items 3, 4, and 6 are verified by a member who did not write the README or the pipeline code. The verifier column records who checked.
Product Owner: Hina Kramer. Scrum Master: to be chosen at Sprint 3 planning (D-025). Weights: final demonstration and presentation 20%, individual contribution and reflection 5%.
1. Final submission checklist (verbatim from the assignment)¶
Before submission, verify that:
#
Item
Verifier
Date
Evidence
Done
1
The selected question and dataset are approved.
Instructor message or approval note
[ ]
2
The repository is accessible to the instructor.
@mkaouer listed as collaborator or repo is public
[ ]
3
The README provides setup and reproduction instructions.
README.md
[ ]
4
The main pipeline runs from a clean environment or documented container.
Fresh-clone run log (section 3)
[ ]
5
The repository contains the task backlog, issues, pull requests, reviews, decisions, tests, artifacts, and report materials.
Board, PR reviews by other members, docs/decisions/, tests/, results/, report/
[ ]
6
The primary tables and figures can be regenerated.
make figures output matches release
[ ]
7
The report distinguishes results from interpretation.
Results vs Discussion sections
[ ]
8
The report includes threats to validity and limitations.
THREATS_TO_VALIDITY.md and report section
[ ]
9
The AI-use log (and disclosure) is complete.
ai-use-log.md
[ ]
10
Every member has documented an individual contribution and reflection.