Kaizen backlog

Kaizen means small, continuous improvement. In this project a kaizen item is any change to how the team works, as opposed to what it builds. Kaizen items are GitHub issues with the kaizen label so that they show up on the board and in the metrics (kaizen_closure_rate). This file is the human-readable index.

How items flow

flowchart LR
  A[Retrospective, waste log,<br/>or control chart signal] --> B[Root cause<br/>5 Whys or fishbone]
  B --> C{Size?}
  C -- one change --> D[kaizen issue<br/>label: kaizen + type:process]
  C -- several changes --> E[A3 document<br/>+ one kaizen issue per countermeasure]
  D --> F[Done when the KPI moves<br/>or the change is merged]
  E --> F
  F --> G[Closed; row updated here]

Rules: 1. A kaizen issue names the KPI or waste it targets and the value it should reach. 2. It has an owner, an estimate, and the current sprint milestone. 3. It is closed only when the change is merged and, where a KPI applies, the next weekly snapshot shows the effect, or the team explicitly records that the effect could not be measured. 4. The retrospective reviews every open kaizen item before creating new ones. Open items older than one sprint are either re-prioritized or closed as not_planned with a reason.

Items

ID Issue # Title Source KPI or waste targeted Target Sprint opened Owner role Status
KZ-01 #9 Enable branch protection on main (require PR, one review, CI green) Rubric Sprint 1 deliverable; FMEA R08 first_time_right, reproducibility Protection active before first Sprint 1 PR Formation Scrum Master Open
KZ-02 #10 Adopt a 48 h PR review SLA with reviewer rotation FMEA R12; charter pr_first_review_hours median <= 48 h Formation Scrum Master Open
KZ-03 #11 Automate the weekly metrics snapshot (GitHub Actions workflow LSS metrics) LSS plan All process KPIs First automated PR merged by Sep 21 Formation Developers Open
KZ-04 Same-day issue creation for ideas raised in chat Value stream map Waiting (idea to issue) < 1 day Sprint 1 (planned) Product Owner Planned
KZ-05 Definition of Ready enforced at planning Value stream map rework_ratio <= 0.15 Sprint 1 (planned) Product Owner Planned
KZ-06 Split CI: unit tests on push, full pipeline on PRs to main and nightly Value stream map CI wait time < 5 min on push Sprint 2 (planned) Developers Planned

Fill in issue numbers when the issues are created with scripts/bootstrap_github.py or by hand.

Closure summary by sprint

Sprint Opened Closed Closure rate Most important improvement (from retrospective)
Formation 3 0 0.00
Sprint 1
Sprint 2
Sprint 3

The Sprint 3 retrospective must name the single most important process improvement of the semester and back it with a before and after KPI value from the dashboard history (metrics/history.csv).