KPI catalogue

This is the authoritative list of what the team measures. Every KPI here is emitted by scripts/lss_metrics.py (implemented in src/msr_pipeline/lss_metrics.py) under the JSON key shown, and rendered in metrics/DASHBOARD.md. Targets come from project.yml under metrics:; the defaults listed here apply when a key is missing.

Summary table

KPI JSON key Unit Target (default) Status rule
Velocity kpis.velocity story points per sprint none (trend only) info
Commitment reliability kpis.commitment_reliability ratio >= 0.80 ok if >= target
Cycle time kpis.cycle_time_days days (median) <= 5 ok if median <= target
Lead time kpis.lead_time_days days (median) <= 10 ok if median <= target
Throughput kpis.throughput_per_week issues closed per week none (trend only) info
WIP kpis.wip open in-progress issues <= wip_limit (5) ok if <= limit
Blocked time kpis.blocked_time_days days (total and mean) none (trend only) info
PR first-review turnaround kpis.pr_first_review_hours hours (median) <= 48 ok if median <= target
PR open-to-merge cycle time (extra KPI) kpis.pr_merge_hours hours (median) <= 96 ok if median <= target
First-time-right kpis.first_time_right ratio >= 0.75 ok if >= target
Rework ratio kpis.rework_ratio ratio <= 0.15 ok if <= max
Defect count kpis.defect_count count none (trend only) info
CI pass rate kpis.ci_pass_rate ratio >= 0.90 ok if >= target
Contribution balance kpis.contribution_gini and contribution.* Gini, shares each share in [0.15, 0.45] warn if any member outside
Kaizen closure rate kpis.kaizen_closure_rate ratio >= 0.70 (informational until Sprint 3) ok if >= 0.70
Reproducibility check kpis.reproducibility_check pass / fail / nodata pass ok if pass

Status values used in the dashboard: ok, warn, info, nodata. A warn on a targeted KPI is reviewed at the Thursday check-in; two consecutive weeks of warn on the same KPI require a 5 Whys.

History: while the project was briefly run by one member (2026-09-14, ADR-0005), contribution balance and first-review turnaround were paused. Both were restored on 2026-09-15 (ADR-0006, decision D-021). PR open-to-merge cycle time was kept as an extra KPI.

Definitions

Velocity

  • Definition. Sum of story points of issues in a sprint milestone that were closed as completed (state_reason = completed, not not_planned).
  • Formula. sum(points(issue) for issue in milestone if closed_completed). Points come from, in order: an estimate field if the fixture provides it, a label of the form sp:N, points:N, or estimate:N, or a line Estimate: N or Story points: N in the issue body. Issues without points count 0 points but still count as issues.
  • Data source. GitHub Issues, milestones.
  • Owner. Product Owner.
  • Signal action. A drop of more than 30 percent between sprints triggers a retro question on scope or capacity.

Commitment reliability

  • Definition. Share of the sprint commitment that was completed.
  • Formula. done_points / committed_points when committed points > 0, else done_issues / committed_issues. Committed = issues in the milestone created no later than the end of sprint day 1 (start date plus one day). Items added later are scope change and are reported separately as added_after_planning.
  • Data source. Issues, milestones, project.yml timeline.
  • Target. >= 0.80. Owner. Scrum Master.
  • Signal action. Below target: retro must identify whether planning over-committed or execution stalled; adjust the next sprint commitment.

Cycle time

  • Definition. Time an issue spends being worked on, from start of work to closure.
  • Approximation. The Project board Status field is not exposed in the REST issue timeline, so the start of work is approximated as the earliest of: the first assigned event, or the first labeled event whose label is in progress (case-insensitive, also status:in progress). If neither exists, created_at is used and the record is flagged approximated: true. End is closed_at.
  • Formula. (closed_at - start) / 1 day, median and mean over issues closed in the window, excluding PRs and issues closed as not_planned.
  • Control chart. XmR individuals chart in closure order; limits and run rules per metrics/README.md.
  • Target. median <= 5 days. Owner. Scrum Master.
  • Signal action. Run-rule signal triggers a 5 Whys on the specific issues beyond the limit; a systematic shift triggers WIP limit review.

Lead time

  • Definition. Time from issue creation to closure. Includes waiting in the backlog.
  • Formula. (closed_at - created_at) / 1 day, median and mean.
  • Target. median <= 10 days. Owner. Product Owner.
  • Signal action. Large gap between lead and cycle time means items wait too long in Todo; refine the backlog or reduce batch size.

Throughput

  • Definition. Issues closed as completed per week over the reporting window.
  • Formula. closed_completed_count / max(1, window_weeks).
  • Owner. Scrum Master. Trend only.

WIP

  • Definition. Open issues that are assigned to someone or labeled in progress.
  • Formula. Count at snapshot time. Compared with wip_limit from project.yml (default 5).
  • Owner. Scrum Master.
  • Signal action. Above the limit: stop starting, start finishing; discuss at the next stand-up.

Blocked time

  • Definition. Time issues carry the blocker label.
  • Formula. For each issue, sum intervals between a labeled: blocker event and the next unlabeled: blocker event, or closed_at, or the snapshot time if still open. Reported as total days, mean days per blocked issue, and the count of currently open blockers.
  • Owner. Scrum Master.
  • Signal action. Any blocker open more than 3 days is listed in the dashboard and raised at the next stand-up.

PR first-review turnaround

  • Definition. Hours from PR creation to the first review submitted by someone other than the PR author (any review state, including comments).
  • Formula. (first_review.submitted_at - pr.created_at) / 1 hour, median and mean over PRs that received a review. PRs without a review are counted separately as unreviewed_open and unreviewed_merged.
  • Control chart. XmR individuals chart in PR creation order.
  • Target. median <= 48 hours (pr_first_review_hours_target). Owner. Scrum Master.
  • Signal action. Above target for two weeks: enforce the review SLA in the charter and rotate reviewer duty. Any unreviewed_merged PR is raised at the next check-in, because main requires one approving review.

PR open-to-merge cycle time (extra KPI)

  • Definition. Hours from PR creation to merge.
  • Formula. (merged_at - created_at) / 1 hour, median and mean over merged PRs.
  • Target. median <= 96 hours (pr_merge_hours_target). Owner. Scrum Master.
  • Signal action. Above target for two weeks while first review is within target: PRs are too large or review comments wait too long for a response; split PRs and agree a response time for authors.

First-time-right rate

  • Definition. Share of merged PRs that were approved without any CHANGES_REQUESTED review.
  • Formula. merged_prs_without_changes_requested / merged_prs.
  • Target. >= 0.75. Owner. Developers.
  • Signal action. Below target: look at the review comments for recurring causes (missing tests, unclear issue) and add a checklist item to the PR template.

Rework ratio

  • Definition. Share of closed issues that needed rework.
  • Formula. count(closed issues with label rework OR with a reopened event) / count(closed issues).
  • Target. <= 0.15. Owner. Product Owner.
  • Signal action. Above target: the acceptance criteria on issues are not clear enough; run a Definition of Ready review.

Defect count

  • Definition. Issues labeled bug.
  • Formula. defect_count = bug issues created in the window. escaped_defects per sprint = bug issues whose milestone is that sprint and whose created_at is after the sprint end date.
  • Owner. Developers. Trend only.

CI pass rate

  • Definition. Share of completed workflow runs that succeeded.
  • Formula. success_runs / (success_runs + failure_runs + timed_out_runs). Cancelled and skipped runs are excluded. Runs of the LSS metrics workflow are excluded.
  • Target. >= 0.90. Owner. Developers.
  • Signal action. Below target: no new feature PRs until main is green.

Contribution balance

  • Definition. How evenly work is shared across the four members.
  • Formula. For each member: commits, prs_authored, reviews_given, issues_closed (issue closed as completed with the member as assignee). Share per category = member count divided by the category total. share_overall = mean of the category shares over categories whose total is > 0. contribution_gini = Gini coefficient of the share_overall vector (0 = perfectly even, 1 = one person did everything). Members are taken from project.yml team[].github; other authors (bots, instructor) are listed under others.
  • Target. Every member share_overall in [0.15, 0.45] (contribution_share_min, contribution_share_max); flag is set on members outside the band.
  • Owner. Scrum Master.
  • Signal action. A flagged member is a conversation at the Thursday check-in about rebalancing assignments, not a judgment. Early Sprint 1 values are skewed by the repository setup work done before the group was reinstated; read the trend, not the first snapshot.

Kaizen closure rate

  • Definition. Share of process-improvement items that were completed.
  • Formula. closed kaizen issues / all kaizen issues (label kaizen).
  • Target. >= 0.70 by the Sprint 3 review. Owner. Scrum Master.

Pipeline reproducibility check

  • Definition. Result of the most recent completed run of the CI workflow (name from project.yml metrics.reproducibility_workflow, default CI) on the default branch.
  • Values. pass if the latest run succeeded, fail if it failed, nodata if no run exists.
  • Owner. Developers.
  • Signal action. fail blocks the sprint review until fixed.

Review cadence

When Who What is read
Monday Scrum Master, with one approving reviewer Merge the weekly metrics PR, note any warn
Thursday check-in Whole team, 15 minutes KPI table, run-rule signals, open blockers, contribution flags
Sprint review Whole team, Product Owner presents Sprint summary table (velocity, reliability, added after planning)
Retrospective Whole team, Scrum Master facilitates Two-week trend of any warn, waste log, kaizen closure

Data window

By default the script reports on everything since the since date given on the command line, or the formation start date in project.yml when omitted. Sprint-level rows use milestone titles first (Sprint 1, Sprint 2, Sprint 3, Formation, Finalization) and fall back to the closing date against the timeline in project.yml.