RACI matrix

How to use: R = Responsible (does the work), A = Accountable (one person, signs off), C = Consulted, I = Informed. Roles are per sprint; see README.md for who holds them. "Dev" means every member acting as Developer / Researcher.

Activity Product Owner Scrum Master Dev (each member) Instructor
Order the research backlog against the rubric A/R C C I
Write acceptance criteria on issues A C R
Sprint planning facilitation C A/R R
Sprint goal statement A/R C C I
Work sign-ups and assignment matrix A R R (each files a sign-up)
Written stand-ups (Mon/Wed/Fri) R A R
Thursday check-in and board hygiene C A/R R
Weekly metrics PR review and dashboard reading C A/R I
Implement pipeline, tests, docs C I A/R (issue owner)
Pull request review (different member than author) I I A/R (reviewer)
Validation labelling, primary rater C I R (Jerad Dunne, jd)
Validation labelling, second rater C I R (Leticia Aderhold la for drift; Hina Kramer hk for lineage, D-024)
Blindness rule for label commits A R R
Data dictionary and threats-to-validity updates A I R
Sprint review package and demo A/R R R I (receives)
Gemba walk (fresh-clone reproduction) I A R (non-author)
Retrospective facilitation, 5 Whys, kaizen issues C A/R R
Decision records (ADRs) and decision log A R C I
Meeting notes I A/R C
Risk register (FMEA) updates C A/R C
AI-use log entries I A (completeness check) R
Report writing A C R I
Presentation and demonstration A R R I
Individual reflection I I A/R (own) I
Communication with the instructor about dates or scope C A/R I C